Home / Reviews
Reviews
Twelve jobs around the lake, described by the people who live with the results.
A studio floor that takes a beating
"I throw pots in the walk-out basement of our place near Hope, and I wanted a floor down there that could take dropped tools and a wet mop without feeling like a garage. Wes tested the slab for moisture before he would even talk about products, then glued strand woven bamboo straight to the concrete. I have dropped a full kiln shelf on it since. The shelf lost."
"He left me half a box of spare planks with the batch number written on the lid, and showed me how one would be swapped if I ever managed to ruin it. Nobody has ever handed me the leftovers with instructions before."
Dining room stains, gone
"A radiator had been weeping onto our oak dining room floor for years before we bought the house, and the black ring it left would not sand out. Wes lifted the six worst boards, wove in old oak he had salvaged from another job, and refinished the room so I honestly cannot find the patch. He also made a new oak threshold for the kitchen doorway on site, because the old one was split."
He talked me out of the stain
"I was sure I wanted a dark walnut stain on our maple floors. Wes sanded a patch by the window, brushed on three sample colors and one clear coat, and told me to look at them for two days before deciding. The clear coat won easily. I would have regretted the dark one within a month, and he knew it, but he let me see it for myself."
"One length of the original stair nosing was missing. He shaped a new piece by hand to match the old profile, and I can no longer tell you which one it is."
Wainscot in the back hall
"Our back hall takes a kicking from skis, dog crates and grocery bags, so we asked Wes for beadboard wainscot with a chair rail and a row of pegs. He drew it on the wall in pencil first so we could argue about the height, primed every board on both sides in his shop, and had it up and painted in three days. The cap lines up dead level with the window stool, which I am told was not an accident."
Trim in a log house
"We live in a log home outside Sagle, where nothing is flat and the walls are round. Wes cut each piece of window and door casing to follow the logs, so the trim sits tight to the wood with no filler strips. Two other carpenters had told us it could not be done neatly."
Ready to list in three weeks
"We were getting my late mother’s house in Kootenai ready to sell and had three weeks before the photographer came. The bedrooms had carpet from the eighties and every wall was a different shade of peach. Wes gave us one schedule that covered both jobs: paint first, room by room, then laminate through the bedrooms and hall, then baseboard back on. He sent a short list each Friday of what was done and what was next, which mattered a great deal because we live four hours away. He finished two days early. The agent asked for his number before she had finished walking through."
New floor without closing the shop
"I own a small yarn shop in downtown Sandpoint and could not afford to shut for a week to replace a worn out floor. Wes worked out a plan to do it in two halves, starting after closing on a Saturday and working through Sunday, two weekends running. He moved the shelving himself, bolted it back to the wall where it had been, and I opened on time both Mondays. Customers push strollers and walkers over the vinyl plank all day and it has not marked. Several of them have asked who laid it."
Tile hearth and a flush edge
"We wanted a tile pad under our new wood stove and engineered oak in the rest of the room, with no raised strip between the two to catch a toe. Wes built up the pad so the tile and the wood finish at exactly the same height, and ran a thin oak border around it. It looks like one floor. He also noticed the installer’s drawing put the pad two inches too small for the stove’s clearances and sorted that out with them before he cut a single tile."
A bare apartment over the shop
"We built an apartment above our workshop in Priest River and ran out of energy at the drywall stage. The slab downstairs and the apartment floor both have heat tubing in them, and Wes knew which engineered boards were rated for that and which were not. He floated the floor, then cased every door and window and ran baseboard through the whole place. It went from a white box to somewhere you would want to live in about two weeks. He was careful, he was cheerful, and his sawdust went home with him every night."
You cannot find the seam
"We added a room to the back of the house and wanted its new oak floor to run into the old one with no line at the doorway. Wes laced the new boards into the old, one row at a time, then finished both rooms together. Friends ask which part is the addition."
Office floor in a day
"Wes replaced the carpet in my home office with laminate in a single day. My desk chair finally rolls, the closet doors were trimmed to clear the new floor, and he was gone by five. Easy from first call to last."
The guest cabin
"Small job: vinyl plank in our one room guest cabin. He treated it like it mattered, sealed the edges against the damp, and charged what he said he would. We have him down for the main house in spring."
Start your project
Call, text or email for a ballpark figure. A written bid comes after a visit to measure, free within 20 miles of Sandpoint.